拉西瓦水电站拱坝混凝土原材料及配合比优化
任宗社[1] 王世锟[2] 张华臣[3]
[1]黄河上游水电开发有限责任公司拉西瓦建设分公司,青海贵德811700 [2]青海禹天监理公司,青海西宁810008 [3]中国水利水电第四工程局勘测设计研究院,青海西宁810007
摘 要:
拉西瓦水电站大坝为混凝土双曲薄拱坝,最大坝高250m,地处高原寒冷地区,坝体混凝土采用通仓浇筑方式。为保证混凝土质量,针对拉西瓦水电站工程的特点,确定了混凝土用原材料的技术要求和混凝土配合比设计原则,提出了适用于工程的混凝土配合比。[著者文摘]

文章出处:
《水力发电》-2007年33卷11期 -11-15页
栏目信息:
文献标识码:
A
文章编号:
0559-9342(2007)011-0011-05
Optimization of Concrete Raw Materials and its Mix Proportion of the Arch Dam for Laxiwa Hydropower Station
Ren Zongshe, Wang Shikun, Zhang Huachen (1. Laxiwa Construction Branch of the Yellow River Upstream Hydropower Development Co., Ltd., Guide Qinghai 811700; 2. Qinghai Yutian Supervision Company, Guide Qinghai 810008;3. Investigation Design & Research Institute of China Water Conservancy and Hydropower Engineering Bureau No.4, Xining Qinghai 810007)
Abstract:
The dam for the Laxiwa Hydropower Station is a double-curvature thin arch dam with the maximum dam height of 250m and is located in the cold highland area. The concrete of dam body adopted the pouring throughout working surface. To ensure the concrete quality and according to the characteristics of the Laxiwa Hydropower Project, we deter-mined that the technical requirements of raw materials of concrete and the design principle of concrete mix proportion and put forward the concrete mix proportion thatis suitable to this project.[著者文摘]
Key words:
arch dam; concrete; materials; mix proportion; Laxiwa Hydropower Station