摘 要:
介绍验槽(桩)前的准备工作和验槽(桩)时必须具备的资料和条件,详细阐述了勘察人员在验槽(桩)时应注意的几种情况及局部不良地质的处理。[著者文摘]

文章出处:
《科技广场》-2007年7期 -252-253页
Science Mosaic
栏目信息:
分 类 号:
文献标识码:
A
文章编号:
1671-4792-(2007)7-0058-02
相关文章:
Study on the Problem about Checking Slot & Pile and Coping with the Part Geology
Lukc(Institute of Construction & Contrivance of Pingxiang, Jiangxi Pingxiang 337055)
Abstract:
The paper introduces the preparation job, data and condition when checking slot and pole. Then, this paper expounds some conditions which being worth it paying attention to and coping with the part geology when checking.[著者文摘]
Key words:
Checking Slot and Pile; Shallow Basis; Deep Basis; Handle Method

更多评论>>文章评论
学术















cqvip.com