Study on the plastic concrete cut-off walls of border dam in Dongping Lake district of flood detention
DENG Mingji, XU Qianjun, CAO Xianfeng ( State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beinjing 100084)
Abstract:
The Dongping Lake district of flood detention is the important flood-prevention project of the Yellow River in Shandong province. Because the dam body is poorly filled and the basement is not strengthened, a large amount of water effuses from the dam. This flow can lead to some breaches as blowout and piping etc, which endanger the dam. To reinforce the dam, the plastic concrete cut-off walls are used to prevent the seepage. In this paper, the design of plastic concrete mix and its mechanics properties are studied and the mixture that has big maximum strain is researched. At the same time, the research also predigests the composite and workmanship, and reduces the capital costs.[著者文摘]
Key words:
hydraulic material; plastic concrete; test research; cut-off wall; Dongping Lake border dam