毛家河水电站重力坝基本体形设计回顾

下载全文 在线阅读
[全文大小:175 K]
[在线阅读,第一页免费]

王军平 王小红

中国水电顾问集团贵阳勘测设计研究院,贵州贵阳550002

贵州水力发电
订阅本刊

摘  要:

毛家河水电站枢纽区由于地质条件复杂,随着地质勘探工作的不断深入,揭露出坝基摆佐组(C1b^2)风化带内原生泥页岩夹层次生泥化普遍,新鲜基岩为炭质灰岩与炭质泥页岩互层,因此大坝深层抗滑稳定问题凸显。要较好地解决该水电站大坝的深层抗滑稳定问题,需采取相应工程措施或调整大坝体形,使其在满足抗滑稳定的前提下,施工最方便、增加投资最少、影响工期最短。[著者文摘]

Guizhou Water Power

分 类 号:

TV624.3

文献标识码:

B

文章编号:

1007-0133(2008)01-0031-03

相关文章:

主题相关

Review of Basic Shape Design of Gravity Dam Body for Maojiahe Hydropower Station

WANG Jun-ping, WANG Xiao-hong (Guiyang Investigation Design & Research Institute, Hydropower Consulting Group of China, Guiyang, Guizhou, 550002, China)

Abstract:

Geological conditions of Maojiahe hydropower station pivot area are very complex, in pace with geological survey work going deep, engineer had discovered that there usually are gault clay among some original argillaceous shale strata of weathering belt in dam foundation, and fresh foundation rock strata are carbonaceous limestone alternating with carbonaceous shale. The stability against sliding in deep stratum of the dam became a key problem. In order to solve this problem some engineering measures need be adopted, or body shape of the dam need be modified. The body shape modifying of the dam not only met stable conditions against sliding but also made construction convenient, invest less and construction period short.[著者文摘]

Key words:

hydraulic structure, gravity dam, review of body shape design, shortest construction period

收稿日期: 2007-08-10

作者简介:

王军平(1974-),女,湖北省天门市人,工程师,学士,从事水工建筑物设计工作。