堆载预压与强夯在某港区地基处理中的应用
隆威[1] 吴晓恩[1] 刘之葵[2] 杨平园[2] 邓君君[1]
[1]中南大学地学与环境工程学院,湖南长沙410083 [2]桂林工学院土木工程系,广西桂林541004
摘 要:
结合工程实例,针对不同的地质及环境条件,介绍和探讨了堆载预压和强夯在深圳某港区软基加固工程中的应用、设计方案、施工参数选取、施工中遇到的技术问题和处理方法,并对两种方法加固效果进行了检验和分析。[著者文摘]
文章出处:
《探矿工程:岩土钻掘工程》-2008年35卷1期 -40-43页
栏目信息:
分 类 号:
文献标识码:
B
文章编号:
1672-7428(2008)01-0040-04
Application of Stack Preloading and Dynamic Compaction in Foundation Treatment of a Port Area
LONG Wei, WU Xiao-en , LIU Zhi-kui , YANG Ping-yuan, DENG Jun-jun ( 1. College of Geoscience and Environmentl Engineering, Central South University, Changsha Hunan 410083, China ; 2. Department of Civil Engineering, Guilin institute of Technol- ogy, Guilin Guangxi 541004, China)
Abstract:
Combined with engineering, in accordance with different geological and environment conditions, a study is carried out to the application scope of stak preloading and dynamic compaction in soft foundation treatment of a port area in Shenzhen, the design of construction parameter, the main technical problems arising from construction, as well as solutions to them. The examination and analysis are made on the reinforcement effect of the two methods. The result shows that the analyzer fulfills all design requirements.[著者文摘]
Key words:
stak preloading; dynamic compaction; soft foundation consolidation

学术















cqvip.com