摘 要:
自1986年建成第一座碾压混凝土坝——坑口坝以来,由于碾压混凝土坝建设速度快、造价低、质量可靠等特点,在我国得到了迅速发展。截至2006年年底,我国共建成碾压混凝土坝92座、在建34座。本文简要介绍了我国碾压混凝土坝发展和有关的主要技术特点,并对贫胶粗粒料(准碾压混凝土材料)筑坝技术进行了介绍。[著者文摘]
文章出处:
《中国水利》-2007年21期 -1-3页
China Water Resources
栏目信息:
分 类 号:
文献标识码:
A
文章编号:
1000-1123(2007)21-0001-03
相关文章:
Analysis of key point in dam construction technologies of RCC dam in China
Wang Shengpei
Abstract:
Since the completion of first Roller Compacted Concrete (RCC) dam-Kenkou in 1986, the construction of RCC dam has been accelerated due to the low cost, reliable quality and fast construction speed. By the end of 2006, there were 92 RCC dams completed & there are 34 RCC dams under construction. The main technical features of RCC dam construction, as well as dam construction technology of lean cemented aggregate are introduced.[著者文摘]
Key words:
RCC dam; arch dam; temperature control; cracking
收稿日期: 2007-09-26