摘 要:
在谏壁电厂已有机组容量和取排水口布置的基础上,通过物理模型试验对“以大代小”改建4×330MW机组取排水口布置进行了论证.试验结果表明,“以大代小”改建工程取排水口采用“深排浅取”的布置,排水口蘑菇头采用半封堵且向下游北偏东15°排放的结构,对谏壁电厂现状总体水工布置而言是一个较优的方案.[著者文摘]
文章出处:
《河海大学学报:自然科学版》-2007年35卷5期 -581-586页
栏目信息:
分 类 号:
文献标识码:
A
文章编号:
1000-1980(2007)05-0581-06
Hydraulic arrangement of water intakes and discharge outlets in rebuilding project of Jianbi Electric Power Plant by enlargement of capacity of generating units
XU Shi-kai, ZHU Jin-guo (1. Nanjing Hydraulic Research Institute, Nanjing 210029, China; 2. Jianbi Electric Power Plant, Zhenjiang 212006, China)
Abstract:
Based on the former capacity of generating units and arrangement of water intakes and discharge outlets at Jianbi Electric Power Plant, physical model experiments were performed to test the rationality of the water intake and discharge outlet arrangement in the rebuilding project, in which the generating units with the capacity 4 × 330 MW were adopted. The result shows that the arrangement of water intakes and discharge outlets to realize deep layer discharge and shallow layer water intaking and the structure of semi-closed discharge outlets with water discharging toward downstream in the direction 15° north by east is an optimal scheme for overall hydraulic arrangement in the rebuilding project.[著者文摘]
Key words:
Jianbi Electric Power Plant; hydraulic arrangement of water intake and discharge outlet; thermal discharge