维普资讯
发表评论我要收藏点击“我要推荐”按钮复制地址,将本页推荐给别人看,自己就可以获得积分奖励!点击“我要推荐”按钮复制地址,推荐文章给别人看,自己就可以获得积分奖励。

基于日发电调度计划的超额支付费用算法

下载全文 在线阅读
[全文大小:229 K]
[在线阅读,第一页免费]

盛艳[1,2] 姚建刚[1] 潘力强[3]

[1]湖南大学电气与信息工程学院,湖南长沙410082 [2]湖南师范大学工学院,湖南长沙410081 [3]湖南电力调度通信中心,湖南长沙410007

湖南大学学报:自然科学版
订阅本刊
国际标准刊号:ISSN 1000-2472
国内统一刊号:CN 43-1061

摘  要:

对制定日发电调度计划中的各种约束条件进行了分析和归类,将约束划分为系统固有约束和被动约束,以此为基础定义了实际购电成本中的超额支付费用,并提出了一种通过考虑不同约束条件的组合制定日发电调度计划求取超额支付费用的计算方法.超额支付费用的计算方法能确定电网日常运行中超支的购电费用,帮助电网公司监控电网的经济运行状态,提高电网公司的经济运行水平,控制和降低运行成本.通过算例证明了该计算方法的有效性.[著者文摘]

Journal of Hunan University(Naturnal Science)

栏目信息:

机电工程

分 类 号:

TM73 TP18

文献标识码:

A

文章编号:

1000-2472(2008)03-0046-04

相关文章:

参考文献(11篇) 耦合文献(39篇)  主题相关

[参考文献]

Calculation of the Above-Norm Payment of the Purchasing Cost Based on the Daily Generation Schedule

SHENG Yan, YAO Jian-gang, PAN Li-qiang (1. College of Electrical and Information Engineering, Hunan Univ, Changsha, Hunan 410082, China; 2.Technological College, Hunan Normal Univ, Changsha, Hunan 410081, China; 3. Hunan Electric Power Dispatch & Communication Centre, Changsha, Hunan 410007, China)

Abstract:

In the interim of the restructure of the power market in China, the grid company should guarantee the security of the operating network and balance the profit of each generation company, thus the electricity purchasing cost related to the practical generation schedule sometimes exceeds the optimal purchasing cost. Based on the re-classification of the constraints set, the above-norm payment was defined and a practical above-norm payment calculating method was proposed. The proposed method took into account two different combinations of the constraints to develop the generation schedule and to calculate the above-norm payment. At last, an example was presented to demonstrate the effectiveness of this quantitative analysis of the above-norm payment. The above-norm payment can help the grid company to monitor the purchasing cost overruns, and to promote measures to improve economic operations.[著者文摘]

Key words:

power market; generation schedule; electricity purchasing cost; above-norm payment; constraints

收稿日期: 2007-12-14

基金资助:

国家科委创新基金资助项目(07C26214300719)

作者简介:

盛艳(1975-),女,湖南益阳人,湖南大学博士研究生 通讯联系人,E-mail:yaojiangang@126.com

更多评论>>文章评论
你是匿名用户 登录 | 注册 验证码 刷新
中国业务群个人门户,免费下载!
更多>>相关文章
天元数据 维普资讯 版权所有 Copyright © 2001-2008 cqvip.com Inc. All rights reserved.
渝ICP证 B2-20050021  违法和不良信息举报中心
建议使用:1024x768分辨率,16位以上颜色